The Task
In order to supply the production facilities of a large food supplier economically with energy, a combustion line together with all auxiliary equipment was to be designed in consideration of the prevailing geographic conditions. Meeting the requirements for high availability, the plant concept was developed on the basis of comparable realised plants. Besides the steam generator and combustion system the order placed by Nehlsen AG, acting as waste-management Company, investor and plant operator, comprised further plant components and services.
The Solution
On the basis of comparable realised plants, Standardkessel Baumgarte developed a concept which conforms to the prevailing conditions and meets the requirements for a high availability period. After a long planning phase as from February 2004 Nehlsen AG and Standardkessel Baumgarte finally signed the contract in February 2005. The very challenging time schedule was kept so that the commissioning, the performance record and plant takeover took place in consideration of the agreed conditions in the second quarter of the year 2007.
For more information, please see our reference sheet.
"We deliver an innovative and specially adapted technology for a sustainable and effective energy supply tailor-made for your needs".

Olaf Schumacher
Head of Sales
Technical data
1
Domestic/ Industrial waste
min.11 MJ/kg
nom.14 MJ/kg
max.18 MJ/kg
min.6.60 t/h
nom.12.20 t/h
max.13.15 t/h
47.5 MW
54.8 t/h
43 bar
400 °C
125 °C
95,000 m³ i. N./h
170 °C
17. Federal German Pollution Control Act
2007