THE TASK
At its Emsland location in Lingen, RWE Power AG operates two natural gas-fired combined cycle units with an output of 410 MW. A further power plant unit was constructed as a combined gas and steam plant with an electric output of about 875 MW and started commercial operation in August 2009. Due to the advanced age of the existing upstream gas turbines in the combined cycle units they were replaced by new gas turbines and the existing plant was modernised with further measures. Standardkessel Baumgarte received an order for the detailed design, the preparation of the necessary tender documents for the component-wise award of sub-contracts for the work lots as well as technical support for the project up to commissioning.
THE SOLUTION
After exact process engineering design as well as the preparation of the tender documents, Standardkessel Baumgarte was able to award sub-contracts for the job lots component-wise to appropriately highly qualified suppliers. With project management, construction and commissioning management as well as supplier support, it was possible to lead the project successfully up to commissioning.
For more information, please see our reference sheet.
"In order to meet the demands of a volatile energy market, we have made it our mission to realise our plants with maximum efficiency and high availability."
Sebastian Zimmer
Head of Proposals Energy Production
Technical Data
2
GT Exhaust Gas
168.6 kg/s
429 °C
58 MW
813.3 MW
1140 t/h
535 °C
186.7 bar
271.3 °C
190 °C
Erdgas
One Trough Boiler (Benson)
2012