The councils of Aberdeen City, Aberdeenshire and Moray are constructing an energy from waste plant at the Aberdeen location, in the North-East of Scotland. ACCIONA will be responsible for the design and turnkey construction, commissioning and the O&M of the plant for a 20 year period. Standardkessel Baumgarte’s (SBG) scope of supply comprises designing and supply of the boiler plant, including the firing system and the flue gas cleaning system.
The plant comprises a line for the thermal recycling of household waste. The core component supplied by SBG essentially consists of an air-cooled grate furnace and a steam generator for generating superheated steam with three vertical radiation passes, a horizontal convection pass and a vertical economiser. A selective non-catalytic denitrification plant (SNCR) and a quasi-dry flue gas cleaning plant with bag filter are used to clean the exhaust gases.
For more information, please see our reference sheet.
Domestic refuse
1
7.5
.J/kg minimal
9.3
MJ/kg nominal
13.0
MJ/kg maximal
19
t/h nominal
49.1
MW
63
t/h
425
°C
64
bar
145
°C minimal
160
°C maximal
130
°C
103,000
Nm³/h nominal
IED
2021
“We deliver an innovative and specially adapted technology for a sustainable and effective energy supply tailor-made for your needs.”