MVV Environment Baldovie Ltd., a subsidiary of the Mannheimer Energy Company MVV, commissioned Standardkessel Baumgarte as general contractor for the turnkey supply, construction and commissioning of the energy from waste power plant in Dundee, Scottland. The plant will be constructed next to an already existing fluidised bed firing unit and is to replace the latter in the long term. The electricity generated will be fed into the public grid and a neighbouring industrial company will be supplied with steam.
The plant is designed with the proven firing and boiler concept by Standardkessel Baumgarte. The technical concept chosen for the incineration lines was supplied from one and the same source by Standardkessel Baumgarte. The supply includes, among other things, an air-cooled moving grate, three vertical radiation passes and a vertical economizer. The scope of supply extends over the entire plant, including construction work.
For more information, please see our reference sheet.
Domestic and industrial waste
1
7.50
MJ/kg minimal
10.47
MJ/kg nominal
12.50
MJ/kg maximal
12.64
t/h minimal
13.72
t/h nominal
19.15
t/h maximal
39.9
MW
49.2
t/h
405
°C
44
bar
130
°C
83,070
m³ i.N./h nominal
145
°C minimal
155
°C maximal
2020
WID
“We deliver an innovative and specially adapted technology for a sustainable and effective energy supply tailor-made for your needs.”