The South Korean company WELCRON Hantec Co. Ltd. commissioned Standardkessel Baumgarte with the supply of the firing system of the new energy from waste plant in Seosan, South Korea. This grate firing system sets new standards as regards the thermal power capacity for Standardkessel Baumgarte. The plant will have a maximum rated thermal input of 130 MWth and hence be the world’s largest plant of this type in the waste sector.
The technical concept chosen for the incineration lines was supplied from one and the same source by Standardkessel Baumgarte. In addition to the fuel feeding system, the well-proven firing system includes a 3-track forward pusher grate with water cooled grate bars, slag chutes and a hydraulic unit for operating the feeding and forwarding.
For more information, please see our reference sheet.
domestic and industrial waste
processed
1
15.9
MJ/kg minimal
18.9
MJ/kg nominal
19.9
MJ/kg maximal
26.7
t/h nominal
118
MW
137
t/h
405
°C
53
bar
130
°C
215,000
m³ i. N./h
2018
190
°C
Korean Environmental Guideline
“We deliver an innovative and specially adapted technology for a sustainable and effective energy supply tailor-made for your needs.”