The task

To ensure the supply of energy to the Solvay Company in Bernburg, a second mainstay for energy supply had to be created. The PreZero Energy GmbH (formerly Energie Anlage Bernburg GmbH) and the pharmaceutical enterprise Solvay planned the installation of a waste-to-energy power plant. On the basis of their powerful references with their conception of identical boiler plants, the Standardkessel Baumgarte was able to obtain the order to install three combustion lines with equal performance rating on a turnkey contract basis.

The solution

The well proven technical conception was supplied from one hand source by Standardkessel Baumgarte. The delivery included, but not limited to the furnace area situated above a water-cooled pusher type grate, two vertical radiation passes and a vertical economiser was selected for these waste-to-energy combustion lines. The overall scope of order encompasses the fuel supply, feed-water system, instrumentation and control engineering, building services engineering, the flue-gas treatment system and the stack.

More information can be found in the reference sheet.

Fuel

Domestic and industrial Waste
Processed
 

Number of Lines

3

Low Heating Value

10.5
MJ/kg minimal

15.0
MJ/kg nominal

18.0
MJ/kg maximal

Fuel Throughput

11.3
t/h minimal

16.8
t/h nominal

21
t/h maximal

Rated Thermal Input each

70
MW

Steam Capacity each

80
t/h

Steam Pressure

42
bar

Steam Temperature

410
°C

Feed Water Temperature

130
°C

Flue Gas Volume each

136,000
m³ i. N./h

Flue Gas Exit Temperature

180
°C 

Operating Permit

17. BImSchV

Commissioning

2010

Ideas full of energy!

“We deliver an innovative and specially adapted technology for a sustainable and effective energy supply tailor-made for your needs.”

Olaf Schumacher
Head of Sales

More references

Discover more references from the area of combined cycle power plants, from partial components to complex complete plants and operation & maintenance solutions.