To ensure the supply of energy to the Solvay Company in Bernburg, a second mainstay for energy supply had to be created. The PreZero Energy GmbH (formerly Energie Anlage Bernburg GmbH) and the pharmaceutical enterprise Solvay planned the installation of a waste-to-energy power plant. On the basis of their powerful references with their conception of identical boiler plants, the Standardkessel Baumgarte was able to obtain the order to install three combustion lines with equal performance rating on a turnkey contract basis.
The well proven technical conception was supplied from one hand source by Standardkessel Baumgarte. The delivery included, but not limited to the furnace area situated above a water-cooled pusher type grate, two vertical radiation passes and a vertical economiser was selected for these waste-to-energy combustion lines. The overall scope of order encompasses the fuel supply, feed-water system, instrumentation and control engineering, building services engineering, the flue-gas treatment system and the stack.
More information can be found in the reference sheet.
Domestic and industrial Waste
Processed
3
10.5
MJ/kg minimal
15.0
MJ/kg nominal
18.0
MJ/kg maximal
11.3
t/h minimal
16.8
t/h nominal
21
t/h maximal
70
MW
80
t/h
42
bar
410
°C
130
°C
136,000
m³ i. N./h
180
°C
17. BImSchV
2010
“We deliver an innovative and specially adapted technology for a sustainable and effective energy supply tailor-made for your needs.”